A local Data Mining facility contacted us about designing and building custom filtered vent hoods for their containers that house their server/computers. We fabricated the hoods out of aluminum to keep weight down and also prevent them from rusting/corroding away. For assembling the hoods we relied on rivets, fighting our instinctive reaction to weld everything. This accelerated the fabrication process immensely. The turnaround time between initial evaluation of the project, and the first 4 hoods being completed, was 3.5 weeks.